• May 16, 2021

Third Mainland Bridge Partially Blocked For Repairs


By Franca Joseph (AGENDAWATCHDOG) – Mainland inbound traffic at the Adeniji end of the Third Mainland Bridge has been blocked off with concrete barriers as repair work is set to commence.

The closure, according to Federal Controller of Works, Olukayode Popoola, was meant to enable the commencement of work by the contractor handling the repairs, adding that inward lane had been left open for use by motorists for the duration of the repair work, urging motorists to cooperate with the engineers handling the repairs

Repair work on the bridge is commencing four days after the Minister of Works and Housing, Mr Babatunde Fashola, said the bridge will not be reopened until January 202.The maintenance is to be carried out on a length of 3.5 kilometres out of the 11.8 kilometres of the bridge.


Agenda Watchdog

Read Previous

PDP Demands President Buhari’s Resignation Over Insecurity, Corruption Scandals

Read Next

PDP Dumbstruck By Yakubu Dogara’s Defection To APC